134
Equivalent to #: 247000 per foot huical of Tunnel
#24
笳
driven during the month or £4.1 per lineal foot-
Summary of bost during the mouth.
Justallation Account per lirical foot. Working Acct. during the mouth per luisal foot.
6.2.2.3
4.14
Total aggregate cost during November per lineal foot. ...... 6.1 3.. 4
Equivalent to £ 18.. 10.0 per luical Yard of Junnel-
Tytam Tunnel.
Hong Kong Water works.
Installation Account
Length of Tunnel when completed - Luical feet. 7.344.
Amount experided
on
Installation
Act. from the beginning of the
tunnel to the 30¢ November 188596.49800
Equal
to per lineal foot of Junnel.
Working Account.
Length of Tunnel driven up to the
30 of November 1885-
iv
luisal feet 4033
Amount expireded on Working doct from the beginning of the Tunnel!
to the 30% Now? 1885. Equal to per hical foot of Junnel,
· Summary of bost since the beginning
Installation Acct. per luical foot. Working account per luical foot.
Aggregate Cost of
A
15680 18
13
00
2
2
3
- | 116874|60 || 18992 |
29
2
4
14
3
ن
13
00
2
2
3
29 100
4
14
3
6116
6
Junnel driven per lirical foot. # 4200
Equivalent to
f.
20.9... 6 per luical yard of Tunnel
Hong Kong - 26" of January, 1886.